New building of dormitory and day care center for people with disabilities.
Gardening and landscaping work
- Cancellation,
- earthworks,
- supply and disposal work,
- masonry and concrete work,
- surfacing work,
- Furnishing,
- peace,
- vegetation engineering work,
- plant deliveries,
- Plants,
- lawn work,
- completion maintenance,
- Green roof.
The construction site is located in Würzburg Heuchelhof at Berner Straße 6d. It can be reached via the A3 motorway exit Würzburg Heidingsfeld and the B19 federal road towards Heuchelhof.
The subsoil consists of shell limestone, claystone and yellow limestone layers. The existing soil is loam to silt. The building plot is located in a drinking water protection area.
The work is for the construction of a new dormitory and a day care center for the Housing Foundation for the Disabled. The service includes the execution of soil removal and reinstallation, partly with lime stabilization, leveling, setting curb stones, production of asphalt and concrete paving surfaces including the required substructure, retaining walls made of in-situ concrete, concrete L-elements and dry stone walls, concrete foundations for escape stairs and garbage container housing, planting of Trees, bushes and perennials as well as sowing lawns. The work must be coordinated with the timber and metal construction trade, which creates the garbage container housing as well as the railings and handrails.