- Reelectrification of the Luttre section - Marchienne-au-Pont.
- construction works for foundations for catenary poles and bollards,
- Installation of poles, posts, consoles, sleepers, shrouds, metal equipment, construction equipment, ...,
- transfer work, shifting, re-balancing with resumption of mechanical tensions, and adaptations of the existing contact lines (including sectionings) and of the earth cable,
- excavation work of the new catenaries, on the main tracks A and B of lines 124 and 124A between Luttre and Marchienne-au Pont,
- work to create new sections,
- work of transformation of existing sectionings,
- the removal of existing catenaries, posts, consoles, sleepers, anchors, metallic or non-existent equipment, which have become useless,
- various works such as making dice, ...,
- performance studies for works at catenary installations,
- the supply of metal material, concrete and other materials needed for the work.