The subject of the order is the Overhaul of the pressure part and auxiliary equipment of OP-230 No. 5, 6 and OP-210M No. 8 and 9 boilers.
Details described in Part II - Technical scope.
Renovation should include delivery and assembly as well as all the work necessary to run the repaired devices that meet all of the specified requirements, without introducing additional operating restrictions other than those currently in existence and functionally fully cooperating with the technological system.
Repair of pressure part and auxiliary equipment of OP-230 No. 5 boiler.
Details described in Part II - Technical scope.
Repair of pressure part and auxiliary equipment of OP-230 No. 6 boiler.
Details described in Part II - Technical scope.
Repair of pressure part and auxiliary equipment of OP-210M No. 8 boiler.
Details described in Part II - Technical scope.
Repair of pressure part and auxiliary equipment of OP-210M No. 9 boiler.
Details described in Part II - Technical scope.