New synagogue center, Schloßstraße, 14467 Potsdam, shell construction work
Structural work.
5 600 m 2 wall, attic and parapet formwork:
— 2 450 m 2 ceiling, beam and stair podium formwork,
— 160 m 2 column formwork,
— 230 tonnes of reinforcement steel,
— 410 m 3 WU concrete (walls/floor slab),
— 1 150 m 3 ceiling and wall concrete,
— 450 m 2 double wall elements as semi-finished parts,
— 21 pieces precast stair runs,
— 900 m 2 laminated concrete film,
— 200 m joint plates,
— 900 m 2 insulation floor plate/basement exterior walls,
— various domestic installations (conduits, ground pipes, foundation terder).