Thermomodernization of a residential building in Mikołów at ul. Constitution of May 3 No. 6.
Performance of construction works based on project documentation and submission of works from 8.5.2019 (case number AB.6743.205.2019.AW).
A detailed description of the subject of the contract is included in the design documentation and technical specifications for the execution and acceptance of construction works.
Deadlines for completing the order - until 8.11.2021, where:
- completion date for construction works: until 18.10.2021,
- deadline for ex-post audit: by 8/11/2021.
The scope of works:
- insulation of the facade and basement walls from the outside using the light wet method,
- replacement of roofing from shingle to roof tiles and repair of the roof covering,
- replacement of windows and balcony doors with new PVC joinery in so-called warm assembly,
- replacement for new entrance doors and interior doors to the attic,
- attic ceiling insulation,
- insulation of the basement ceiling,
- roof insulation above the staircase,
- insulation of internal walls of the staircase from the attic side.
Including accompanying works, i.e.
- removal of all foreign and unnecessary elements on the facade and on the roof (removal of bay windows, wills, blinds, grating basement windows, installation of roof windows and hatches),
- arranging the cable routing (laying TV and SAT installations under insulation and bringing the installation to the apartments),
- forging loose fragments of plaster on the facade,
- forging cornices above the plinth and window cornices,
- inserting new ventilators under the windows (in place of existing ones),
- drying and isolation of foundation walls together with crystalline injection,
- flushing rainwater drainage system to the first well,
- installation of new external and internal window sills,
- renovation of stairs (forging of falling parts of stairs and adding concrete to the reinforcing mesh) and installation of a new washed terrazzo surface,
- installing new canopies over the entrances,
- installation of new PVC gutters and downpipes as well as gajgers,
- replacement of flashings,
- installing new roof hatches (2 pcs),
- replacement of the lightning protection installation, flush-mounted on insulated facades and the building framing installation,
- replacement of lighting in places of performed insulation (external lighting mounted on the building facade, basement ceiling and attic),
- installing steel wipers in front of the entrance door,
- banding along the building facade - made of concrete cubes,
- chimney renovation (re-walling and insulation of chimneys from the ceiling level),
- renovation of balconies (forging loose fragments, adding concrete floor with reinforced mesh and inserting system fittings),
- replacement of balustrades for powder coated steel balconies mounted from the outside of the balconies,
- inserting a new lintel above the entrance door and attic,
- accompanying and cleaning works,
- performance of the energy performance certificate of a multi-family residential building (2 copies),
- performing an ex-post audit (2 copies).
Based on the design documentation and notification of works from 8.5.2019 (case number AB.6743.205.2019.AW).
A detailed description of the subject of the contract is included in the design documentation and technical specifications for the execution and acceptance of construction works.