The Lausitzbad Hoyerswerda was built in the 1990s as a family and leisure pool including an extensive sauna area. After 20 years of operation, the Lausitzbad Hoyerswerda is to be modernized and adapted to current user requirements and local needs. The realization takes place in a total of 6 construction phases.
• Lot-owned construction site equipment (including protective measures for finished services)
• Kitchen equipment consisting of:
the Komplettregalen
the Anbauregalen
o Gastro cabinets
o Cold rooms
the Tiefkühlzellen
o Pizza oven
o Frying and frying appliances
o Herds
o Damper
the Wärmeschrank
the Spültischen
o Dishwasher
o Hand wash and sink
o Other equipment (waste bins, clearing trolleys, plate dispensers)