See II.2.4
The work covered by this enterprise includes, at a minimum:
- The dismantling of the existing collector, including its wall brackets;
- The supply and installation of a new collector, with a diameter of 710 mm;
- The drilling of the passages of the new sheath;
- The supply and installation of grids on the 8 sectional doors;
- Assistance in adjusting air flows.