The subject of the order is:
1. Collection and management of the types of municipal waste indicated in the order description from owners of real estate residing in the Drwinia commune in the period from 1.1.2020 to 31.12.2021.
2. Organization and service of the Municipal Selective Waste Collection Point (PSZOK) in the Drwinia commune in the period from 1.1.2020 to 31.12.2020.
A detailed description of the subject of the contract is included in Annex 1 to the ToR.
The subject of the order is:
1. Collection and management of the types of municipal waste indicated in the order description from owners of real estate residing in the Drwinia commune in the period from 01/01/2020. until 31.12.2021
2. Organization and service of the Municipal Selective Waste Collection Point (PSZOK) in the Drwinia commune in the period from 01/01/2020. until December 31, 2020
REQUIREMENTS REFERRED TO IN ARTICLE 29 PAR. 3A PZP.
1) Because the implementation of this contract must be carried out by carrying out activities in the conditions specified in Article. 22 § 1 of the Act of 26 June 1974 - the Labor Code - for the benefit of the contractor or subcontractor, at the place and time indicated by the contractor or subcontractor - the contracting authority, in accordance with art. 29 paragraph 3a of the Public Procurement Law requires employment by the contractor or subcontractor of persons performing activities falling under the so-called direct costs under an employment contract. this requirement applies to persons (manual workers) who perform activities directly related to the work, in particular:
a) related to the collection and export of municipal precipitation from property owners
b) connected with operating the Selective Municipal Waste Collection Point (PSZOK)
2) The method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Public Procurement Law.
The contractor is obliged to submit to the contracting authority, within 7 days of the commencement of the implementation of the subject of the contract, a written statement of the contractor or subcontractor confirming that the employees of the contractor or subcontractor are employed under an employment contract within the meaning of the Act of 26 June 1974. - labor code including the minimum remuneration for work determined on the basis of art. 2 clause 3-5 of the Act of 10 October 2002 on minimum remuneration for work (Journal of Laws of 2015, item 2008 and of 2016, item 1265). this statement should contain, in particular: the exact specification of the entity submitting the statement, the date of submitting the statement, an indication that the activities listed in point 1 are performed by persons employed under an employment contract together with an indication of the number of those persons, the type of employment contract and the full-time employment as well as the signature of the person authorized to make the statement on behalf of the contractor or subcontractor.
3) the contracting authority's powers to control compliance of the contractor with the requirements referred to in Article 29 paragraph 3a of the Public Procurement Law. have been described in the draft contract as an attachment to the ToR.
4) sanctions for failure to meet the requirements referred to above have been specified in the draft contract which is an attachment to the ToR
A detailed description of the subject of the contract is included in Annex 1 to the ToR.