1. The subject of the contract are construction works consisting in the construction of a school with a gymnasium with technical infrastructure, bicycle paths, roads and parking lots, playgrounds, bicycle shelters, a place for collecting solid waste, a water supply connection, a sanitary sewer drain, a battery of 4 retention tanks, a retention and drainage tank, an external gas installation and an electrical connection on Dz. nr 90/17, 90/32, 90/59 obr. 17 in the village of Parzniew, Brwinów commune. The order includes Stages I and II. The construction of a football pitch with a running track and long jump, outdoor lighting of the pitch, drainage installation and collecting drainage is excluded from stage I. The customer resigns from some of the playground sets, part of the AV system from classroom equipment and the self-snow removal function of photovoltaic modules. 2. Parameters of the object: Number of storeys – 2 above-ground floors, 1 underground storey; Usable area of the building 8936,47m2;
1. The subject of the contract is the construction of a school with a gymnasium with technical infrastructure, bicycle paths, roads and parking lots, playgrounds, bicycle shelters, a place for collecting solid waste, a water supply connection, a sanitary sewage sewage drain, a battery of 4 retention tanks, a retention and drainage tank, an external gas installation and an electrical connection for dz.nr ew.90/17, 90/32, 90/59 obr.17 in Parzniew, gm. Brwinów. The order includes Stages I and II. The construction of a football pitch with a running track and long jump, outdoor lighting of the pitch, drainage installation and collecting drainage is excluded from stage I. The customer resigns from some of the playground sets, part of the AV system from classroom equipment and the self-snow removal function of photovoltaic modules. 2. Object parameters: Number of storeys –2 storeys. above-ground, 1 storey. Underground; Area us.bud. 8,936.47m2; Total area 10 191,77m2; Cubic capacity bud. 52 320,93m3; Surfaces: School building 5 393,91m2; Parking lots and roads 4 362,55m2; Sidewalks and band 1 645,45m2; Stairs and ramps 293,74m2; Bicycle paths 222,70m2; Playground (natural grass surface) 1 196,06m2; Grass and existing biologically active surface 29 526.97m2. 3. The order includes the execution of Stage I and Stage II, the scope of which includes: 1) Stage I - construction of a school with technical infrastructure, bicycle paths, roads and parking lots, playgrounds, bicycle shelters, a place for collecting solid waste, water connection, sanitary sewage drain. a battery of 4 retention tanks, a retention and drainage tank, an external gas installation and an electrical connection for dz.nr ew.90/17, 90/32, 90/59 rpm. 17 in Parzniew. The order includes equipping – in accordance with the design document. REMARK. from Stage I is excluded: - construction of a football field with ball catchers, a running track and a long jump. The area intended for the construction of the pitch and running track should be shaped in a way that corresponds to the adjacent area and then sown with grass. - outdoor lighting of the pitch (5 LED lamps on poles marked as O2 with power installation). The design of electrical-replacement installations takes into account the above change. - the sprinkler system and the collection drainage are excluded from the external water and sewage systems. At the same time, the execution of the external installation supplying sprinklers from the Z1 to Z4 retention tank (without equipping the Z2 chamber with devices) and the complete external water supply system, including the designed Z1 retention reservoir, remain to be performed as part of the nin. Order. According to the design of electrical and replacement installations, a cable connector with a power cable should be made to make a pitch with a running track and a sprinkler system in the future. - from equipping classrooms with devices for multimedia presentations, parts of the AV system are dispensed with, i.e.: 65" touch monitor, projector, electric screen, amplifier and 100V ceiling speakers in all classes. Delivery, assembly and power installation are excluded from the order (the design of replacement electrical installations takes into account the above changes in the power supply). In return, interactive flat panels with the parameters specified in the errata for the detailed project should be delivered and installed in all classes (24 pcs.) low-current installations - monitor specification, a computer with a monitor at the teacher's station in each class remains according to the project low-current installations. - from the playground – four playground devices marked on the Playground Project, fig. no. PZ/01 as: 10 - playground set 1, 11- playground set 2, 12-high maiden, 13-play device. -The customer resigns from the function of self-snow removal of photovoltaic modules. 2) Stage II - construction of a gymnasium with sports installations and equipment. 4.The Contractor shall provide a 60-month warranty for defects counting from the date of the final acceptance of works.