The project comprises the creation of facilities to allow the Eastman Dental Institute to relocate from their current facilities at 256 and 123 Gray’s Inn Road into the Rockefeller and Huntley street buildings. As a consequence of the relocation several users already present within the building relocate to new facilities elsewhere within the building. Works are proposed to unconnected spaces across the ground to fourth floor of the building. These works will be implemented while adjacent spaces remain occupied and in-use. The project is being procured as a two stage design and build contract.
Full Design and Build services.