The entrepreneur is responsible for planning, material procurement, production, delivery, assembly and commissioning of secondary technology for the newly built KW Waldemme. A complete, safe and perfectly functioning system is a prerequisite for CKW.
— design and construction of secondary technology,
— overall planning, material, manufacturing and transport to the construction site including unloading and interim storage of the new secondary technology,
— All necessary assembly work including assembly planning,
— commissioning, testing in the factory and on site,
— Execution of trial operations, instructions and training of power plant personnel as well as operational documentation.
The entrepreneur is responsible for planning, material procurement, production, delivery, assembly and commissioning of secondary technology for the newly built KW Waldemme. A complete, safe and perfectly functioning system is a prerequisite for CKW.
— design and construction of secondary technology,
— overall planning, material, manufacturing and transport to the construction site including unloading and interim storage of the new secondary technology,
— All necessary assembly work including assembly planning,
— commissioning, testing in the factory and on site,
— Execution of trial operations, instructions and training of power plant personnel as well as operational documentation.