General building data:
SIA volume: 47,900 m3
Floor area: 11,700 m2
Useful surface: 8,200 m2
Reinforced concrete:
CFC 211.0 - Site Facilities
CFC 211.5 - Concrete and Reinforced Concrete
CFC 212.2 - Precast Concrete Elements (18 Stair Stairs)
CFC 401 - Land Displacement
CFC 411.5 - Concrete and Reinforced Concrete (Exterior Facilities)
Misapor: 2,500 m3
B.A.: 18,000 m3
PAVING: 12'000 m2
Deactivated concrete facades: 1,850 m2
Masonry:
CFC 211.3 - Isolated and Glued Excavations
CFC 211.4 - Inside Piping
CFC 211.6 - Masonry
CFC 130 - Waiting Station
CFC 137 - Interim Closure and Recovery
CFC 151 - Earthworks (pipeline network)
CFC 152 - Piping
CFC 153 - Electrical lines
General building data:
SIA volume: 47,900 m3
Floor area: 11,700 m2
Useful surface: 8,200 m2
Reinforced concrete:
CFC 211.0 - Site Facilities
CFC 211.5 - Concrete and Reinforced Concrete
CFC 212.2 - Precast Concrete Elements (18 Stair Stairs)
CFC 401 - Land Displacement
CFC 411.5 - Concrete and Reinforced Concrete (Exterior Facilities)
Misapor: 2,500 m3
B.A.: 18,000 m3
PAVING: 12'000 m2
Deactivated concrete facades: 1,850 m2
Masonry:
CFC 211.3 - Isolated and Glued Excavations
CFC 211.4 - Inside Piping
CFC 211.6 - Masonry
CFC 130 - Waiting Station
CFC 137 - Interim Closure and Recovery
CFC 151 - Earthworks (pipeline network)
CFC 152 - Piping
CFC 153 - Electrical lines