Builder work for the new construction of the cleaning stage to eliminate micropollutants.
The main quantities approximate include:
.Covering: 240 t
.Drainage: 200 m
.Edge endings: 600 m
.Micro stakes: 25 tensile piles (140m) and 16 pressure piles (180m)
.Ruehlwand: 400 m2
.Excavation: 9,000 m3
.Formwork: 10,000 m2
.Reinforcement: 420,000 kg
.Concrete: 3'000 m3
.Facade scaffolding: 3'500 m2
Builder work for the new construction of the cleaning stage to eliminate micropollutants.
The main quantities approximate include:
.Covering: 240 t
.Drainage: 200 m
.Edge endings: 600 m
.Micro stakes: 25 tensile piles (140m) and 16 pressure piles (180m)
.Ruehlwand: 400 m2
.Excavation: 9,000 m3
.Formwork: 10,000 m2
.Reinforcement: 420,000 kg
.Concrete: 3'000 m3
.Facade scaffolding: 3'500 m2