- Renewal of the municipal road between the districts Haibach and Dörrmorsbach,
- new construction of an accompanying pedestrian and bicycle path, partly off in the area,
- Extension length approx. 1 370 m,
- manufacture of a surface water channel with retention basin and sand trap,
- Renewal of mixed sewage system and water pipe within the building.
Road works - roadway with pedestrian and bicycle path:
- about 10 500 m
- about 2 000 m demolition 2-line gutter,
- about 4 200 m demolition curbs,
- about 5 100 m
- ca.12 200 m
- about 900 m
- ca.12 200 m
- about 900 m
- about 2 000 m 2-line gutter,
- approx. 4 200 m curbs different types,
- 2 barrier-free bus stops,
- about 12 000 m
Surface water channel:
- about 650 m break existing OW-channel,
- approx. 860 m new construction OW-channel PVC-U, DN 315 - DN 250,
- Earth basin as rain retention system V = 120 m
- Sand trap with about 60 m
Combined sewer:
- approx. 210 m new construction of the MV-Kanal Stz / SB, DN 300 - DN 400,
- about 210 demolition existing MW - channel,
- renovation and new construction of canal house connections and street entrances,
- about 4 100 m
Water pipe work:
- approx. 530 m renewal main water pipe DN 100 - DN 150 with partial demolition,
- renewal of the water house connections,
- about 800 m
- About 10 000 m