Construction of a new psychiatric facility at the Aschaffenburg Clinic
Photovoltaic system according to DIN EN 62446-1
442 photovoltaic systems
443 low-voltage switchgear
444 Cables and wires
444 laying systems
446 External lightning protection system
450 telecommunications lines and transmission networks
490 Plant planning, commissioning and certification
556 Electrical installations in outdoor installations
442 photovoltaic systems
Installation of a 180 kWp photovoltaic system on the flat roof of the psychiatric facility of the hospital in Aschaffenburg. Installation of the
substructure, the PV modules and the inverter.
-
443 low-voltage switchgear
Conversion of the low-voltage main distribution board in the existing transformer station. Manufacture of a low-voltage switchgear in the
Outdoor area for the development of the generation plant and future planned electric charging stations. There is a converter cabinet and two
to erect cable distribution cabinets. Installation of the measurement technology, taking into account the specifications of the network operator.
-
444 Cables and wires
Development of the sub-distribution PV system, approx. 150 m cable path from the main distributor of the transformer station.
Laying of control cables and production of DC voltage wiring.
-
444 laying systems
Installation of laying systems for cable routing on the roof and in the area of the garage
-
446 External lightning protection system
In the course of the roof work, the existing lightning protection system must be dismantled and supplemented.
-
450 telecommunications lines and transmission networks
Data technology development of the equipment and installation of the telecontrol technology
-
490 Plant planning, commissioning and certification
In addition to the plant planning, the order also includes the processing of the certification in the form of a type B plant certificate from the
Commissioning of a certification body until the final operating permit of the EZA is obtained.
-
556 Electrical installations in outdoor installations
For the laying of the power cables and control lines recorded in 444, a cable trench with a length of approx. 150 m will be created on site. In the course of
When the cable trench is open, four cable ducts are to be set by the contractor and cable conduits are to be laid.