The buildings A, B, C have 5 x floor levels. KG, EC, 1st floor, 2nd floor, DG.
Buildings A, B and C are shaped like a crest or "E" with a main street side building and several regular building extensions facing the courtyard.
The buildings are modular designed so that many parts have the same mass. The stairwells are built with a lift shaft and precast stairs.
The basement is made of WU concrete. The load-bearing walls of limestone or reinforced concrete. The ceilings are made of reinforced concrete as filigree ceilings. The roofs are reinforced concrete ceilings with a slope of 3%.
Drywall and interior insulation in 3 new buildings with a total of 114 apartments.
Please also note the lot 2 interior plaster work as well as lot 3 interior doors / carpentry work!
Interior plastering New construction with 3 houses and 114 apartments in total.
Please also note the lot 1 drywall / interior insulation and lot 3 interior doors / carpentry!
Interior doors for new construction with 3 houses and 114 apartments in total.
Please also note the lot 1 drywall / interior insulation and lot 2 interior plaster work!