Oberbodenarbeiten: 48.000 m3; Bodenbewegung: 84.000 m3
Material preparation (crushing): 23,500 t
Install antifreeze layer: 18,000 m3
Making banquets: 4,000 m3; Manufacture of shafts: 120 pcs.
Producing road drains: 240 pcs.
Manufacture of pipelines DN 200-1000: 7,400 m
Sedimentation facilities: 3 pcs.; Pressures steel tube: 2 pcs.
Demolition of traffic areas: 165,000 m2
Asphaltfundationsschicht: 165.000 m2
Asphalttragschicht: 165.000 m2
Asphalt binder layer: 165,000 m2 (of which 400 m2 on BW)
Splittmastixasphalt: 4.500 m2;
Open-pored asphalt: 172,000 m2 (of which 400 m2 on BW);
Making median strip crossings: 2 pcs.
Concrete barriers: 7,000 m; steel guardrails fig.: 4,800 m
Road markings film: 37,000 m
Demolition of sign bridge foundations: 450 m3
Stützbauwerk: 230 m; Winkelstützwand: 450 m;
Kabelschutzrohre: 13.000 m
Oberbodenarbeiten: 48.000 m3; Bodenbewegung: 84.000 m3
Material preparation (crushing): 23,500 t
Install antifreeze layer: 18,000 m3
Making banquets: 4,000 m3; Manufacture of shafts: 120 pcs.
Producing road drains: 240 pcs.
Manufacture of pipelines DN 200-1000: 7,400 m
Sedimentation facilities: 3 pcs.; Pressures steel tube: 2 pcs.
Demolition of traffic areas: 165,000 m2
Asphaltfundationsschicht: 165.000 m2
Asphalttragschicht: 165.000 m2
Asphalt binder layer: 165,000 m2 (of which 400 m2 on BW)
Splittmastixasphalt: 4.500 m2;
Open-pored asphalt: 172,000 m2 (of which 400 m2 on BW);
Making median strip crossings: 2 pcs.
Concrete barriers: 7,000 m; steel guardrails fig.: 4,800 m
Road markings film: 37,000 m
Demolition of sign bridge foundations: 450 m3
Stützbauwerk: 230 m; Winkelstützwand: 450 m;
Kabelschutzrohre: 13.000 m