Electrical fitting work | Tenderlake

Electrical fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 July 2021
Closing Date:
23 August 2021
Location(s):
DE2 BAYERN (DE Germany/DEUTSCHLAND)
Description:
Klinikverbund Allgäu gGmbH, Clinic Ottobeuren, FD_BS, VE4400_2 Electron Installation Los1: Functional Diagnostics Lot 2: Fire Protection Renovation

Allgäu gGmbH, Clinic Ottobeuren, FD_BS, VE4400_2 electronic installation

Excerpt from the course:

Los1: Functional diagnostics

The new construction of functional diagnostics is divided into the expansion of the EC BT F and the EC of BT A2. Radiology in BT A2 including emergency room, shock room and examination rooms is partially expanded as group 2 rooms in accordance with DIN VDE0100-710 and requires a secure power supply via an IT system.

The endoscopy in BT F is expanded as group 1 rooms. The installation is carried out according to current national regulations and includes high- and low-current installations and common equipment in hospital construction.

Lot2: Fire protection remediation:

The circuits are clamped/retrofitted on the individual floors. The aim is to install a 2nd SV circuit and a separate AV circuit in the corridors and staircases in order to meet the requirements of DIN VDE 0100-710.

The routes in the hallways (partly necessary corridors) are carried out according to LAR, and the existing routes must be upgraded to this end.

The smoke detectors are installed on plaster in patient rooms without a slope ceiling, clamps and lattice beams are used in the ceiling cavities in the adjoining rooms with a slope ceiling.

Allgäu gGmbH, Clinic Ottobeuren, FD_BS, VE4400_2 electronic installation

Excerpt from the course:

Los1: Functional diagnostics

The new construction of functional diagnostics is divided into the expansion of the EC BT F and the EC of BT A2. Radiology in BT A2 including emergency room, shock room and examination rooms is partially expanded as group 2 rooms in accordance with DIN VDE0100-710 and requires a secure power supply via an IT system.

The endoscopy in BT F is expanded as group 1 rooms. The installation is carried out according to current national regulations and includes high- and low-current installations and common equipment in hospital construction.

Lot2: Fire protection remediation:

The circuits are clamped/retrofitted on the individual floors. The aim is to install a 2nd SV circuit and a separate AV circuit in the corridors and staircases in order to meet the requirements of DIN VDE 0100-710.

The routes in the hallways (partly necessary corridors) are carried out according to LAR, and the existing routes must be upgraded to this end.

The smoke detectors are installed on plaster in patient rooms without a slope ceiling, clamps and lattice beams are used in the ceiling cavities in the adjoining rooms with a slope ceiling.

Download full details as .pdf
The Buyer:
Klinikverbund Allgäu gGmbH
CPV Code(s):
45311200 - Electrical fitting work