Hall partition curtains and ball nets:
The Hanseatic city of Buxtehude intends to build a sports hall as a replacement building at the integrated comprehensive school (IGS) school site. The new sports hall is planned as a 3-field hall in combination with a 2-field hall. The construction project is to be awarded a sustainability certificate from the German Sustainable Building Council (DGNB) in the “Gold” category.
After completion of the preparatory work on the site, the sports hall will be erected with a supporting structure made of reinforced concrete columns and steel trusses. The hall space of the triple sports hall will be equipped with a spacious grandstand system and the roof of the three-field hall will be greened with roofs.
The specifications describe the services of the hall partition curtains and ball nets for the drei- and Zweifeldhalle.
2 pcs separation curtain hoisting systems, w x h = 33.50 x 8.20 m + upper skirts 33.50 x 2.60 m.
1 pcs. safety and stop net, w x h = 20.00 x 8.20 m, incl. motor, flame retardant, in the lower area (2.00 m height) as a closed fleece-coated curtain.
2 safety and stop nets, w x h = 20.00 x 4.50, incl. motor, flame retardant.
1 pcs separation curtain lift system, w x h = 22.20 x 7.25 m + upper apron 22.20 x 1.80 m.
The electrical connection of the drive unit with control and all electrical safety devices is a power component. Connection to the building network on site by electricians.
It is expressly pointed out that for safety reasons, offers without test certificates, such as TÜV type examination, approval certificate for the TÜV machine protection mark, TÜV test certificate of the safety gears, as well as a test certificate on the flame retardancy of the double-shell curtain according to DIN 4102, B1, are excluded from the competition.