As part of the planned overall urban development measure “Western Old Town” as part of the “Urban Monument Protection” funding program, the important historic community center Norderstraße 8/10 (“Eckenerhaus or “Alt-Flensburg House”, usable area approx. 1,090 m²) is to be restored and modernized in accordance with the listed requirements, as well as the Cultivation from the 70s. In this context, a usage concept was developed, based on museum use on the ground floor, a café and public training and event rooms. The goal is a multifunctional use and creation of a place for historical and cultural information. The engineering services for structural design are to be provided in accordance with service phases 1-9 of HOAI § 51 et seq. The creation of thermal insulation of buildings and engineering structures with energy balance sheet is to be created in accordance with performance phase 1-7 of HOAI plant 1.2.
Engineering services for structural design, § 51 ff. Service phases 1-9 HOAI and thermal insulation, service phases 1-9 HOAI Annex 1.2.3 for the following project: As part of the planned overall urban planning measure “Western Old Town” in the funding program “Urban Monument Protection”, the important historic civic center in the city of Flensburg is to Norderstraße 8/10 (“Eckenerhaus or “Old Flensburg House”, usable area approx. 1,090 m²) will be restored and modernized in accordance with the monument, as well as the extension from the 70s. Within this framework, a usage concept was developed, based on museum use on the ground floor, a café with public training and event rooms. The goal is a multifunctional use and creation of a place for historical and cultural information. The following measures are planned for the Eckenerhaus:
- Refurbishment of the historic facades and underpinning of the utluchten
(street façade) and the partially bagged floors on the ground floor
- Cancel the previous one. ventilation systems and elevator systems from the time of
restaurant use
- Installation of a new escape route staircase according to LBO
- installation of a barrier-free lift (corner loader) for barrier-free access to the ground floor,
OG and DG.
The basement level is not accessible by lift.
- gutting of the attic and energy-efficient renovation of the attic
- Demolition of the staircase extension on the side wing in the yard
- Production of a new external staircase as a replacement for the broken staircase on
side wings
- Construction of a new 2nd escape route from the vaulted cellar, including production
an external cellar staircase
The planning for the cultivation from the 1970s - Norderstraße 10 relates to the following measures:
- the existing arcades on the ground floor are omitted and will be used in terms of area
Use assigned on the ground floor
- Demolition of the existing staircase across all floors and making
new floors in this area.
- Demolition of the inner walls on the ground floor including demolition of the floor and foundations.
- renovation of the ground floor facade: creation of new masonry openings,
Enlargement of window and door openings and installation of new lintels.
- Refurbishment/addition of the facing facade
- Creation of a new sole including foundations
- Energetic upgrade of the new ground floor façade (interior insulation)
- Installation of new window and door elements on the ground floor