this consultation concerns only the construction lot of the new station and includes the following elements:
- the creation of a rectangular storm basin in semi-buried reinforced concrete of 1000 m3, on the site of the STEP and comprising 2 lines with an automatic rinsing device by trough and a screening of the discharges,
- the construction of a new wastewater treatment plant with pre-treatment, biological treatment (biological basin and clarifier), tertiary treatment, physico-chemical treatment (primary filtration, flocculation-coagulation, secondary filtration) and sludge treatment,
- the connections of new structures to existing networks with the installation of link collectors and the construction of junction works on the networks,
- the creation of an industrial water borehole,
- the installation of photovoltaic panels on the structures,
- the surface layout of the site of implantation
- the creation of a rectangular storm basin in semi-buried reinforced concrete of 1000 m3, on the site of the STEP and comprising 2 lines with an automatic rinsing device by trough and a screening of the discharges,
- the construction of a new wastewater treatment plant with pre-treatment, biological treatment (biological basin and clarifier), tertiary treatment, physico-chemical treatment (primary filtration, flocculation-coagulation, secondary filtration) and sludge treatment,
- the connections of new structures to existing networks with the installation of link collectors and the construction of junction works on the networks,
- the creation of an industrial water borehole,
- the installation of photovoltaic panels on the structures,
- the surface layout of the site of implantation