Description:
JLV Civil Engineering Operation Electricity FW

The services include civil engineering work in the supply area of Stadtwerke Ingolstadt Netze

GmbH, for planned maintenance measures on the supply network.

The present framework serves to create a contractual basis in order to ensure a rapid and

Smooth execution of maintenance measures in the area of electricity and district heating supply

to be handled.

Type and scope of the call for tenders

The services include civil engineering work in the supply area of Stadtwerke Ingolstadt Netze

GmbH, for planned maintenance measures on the supply network.

The present framework serves to create a contractual basis in order to ensure a rapid and

Smooth execution of maintenance measures in the area of electricity and district heating supply

to be handled.

The Contractor shall ensure that the civil engineering work is carried out on time and independently in accordance with the

Consultation with the Client.

Personnel strength and machine equipment

In order to process the tendered services, the Contractor will appoint two civil engineering teams to

Provided.

The civil engineering teams should be staffed / equipped as follows:

2 construction teams with - foreman

- Excavator incl. operation

- Truck incl. operation

- Shovels

The Contractor shall ensure that its construction crews are equipped with all the necessary tools.

are equipped. The use of additional machines such as .B suction excavators, crane trucks,

With the application of the unit positions, shearing, backfilling or backfilling is used.

Material transport compensated.

The division of the construction teams for a smooth transition between the measures is carried out via

a coordination plan and is incumbent on the Contractor in consultation with the Client.

Materials and components

Unless otherwise stated in the performance items, the material for the pipe and

Cable construction as well as for street lighting from the AG from the storage location of the utility company

(Ringlerstraße 28, 85057 Ingolstadt). From the time of handover, the Contractor is responsible for the

Material responsible. Unless otherwise described in the service items,

required material can be returned to the client. The cost of transport is included in the

To include unit prices.

Traffic safety

The contractor has the sole traffic safety obligation on the construction site and is liable for all

Damage caused by violation of his traffic safety obligation. In this respect, he assumes

also the traffic safety obligation of the client and is liable in relation to the client

to third parties alone. The Contractor shall indemnify the Client against all claims of third parties

due to violation of the traffic safety obligation, insofar as the contractor is responsible for the violation of the

traffic safety obligation is responsible or is responsible. Caused by the Contractor

Contamination of the access roads and paths must be cleaned up at the expense of the Contractor.

Coordination of surveying work

The Contractor shall carry out the surveying work with a surveying company designated by the Client.

coordinate. The surveying work is always carried out on the open trench. The coordination effort is to be included in the DP and is not remunerated separately.

Billing and costing

The basis for the calculation is DIN 4124, ZTVA-StB 97, the respectively valid regulations of the

responsible road developer or the municipality, worksheets of the DVGW and VDE.

The unit prices shall include, inter alia:

Obtaining divisional plans, traffic regulations.

• The fees for the traffic law order are borne by the Client.

Billing address AG must be given to the transport authority

• one-time construction site setup/provision

• Inspection before the start of construction with the representative of the AG

• Traffic and construction site security (point excavations) according to RSA and the

Traffic law order of the traffic authority

• Pick-up, separate lateral storage and later re-installation of topsoil and

unbound gravel base layers

• Picking up and replanting perennials, bushes and restoring

Lawns

• Construction and relocation of traffic auxiliary bridges for pedestrians and motor vehicles

• Excavation, backfilling and installation in accordance with DIN 4124, DIN 18299, DIN 18300 and the

ZTVA-StB 97, mechanically or manually in soils in stock of class 3 to 5

• displaced or unsuitable for reinstallation of soil on a land designated by the AG

Transporting the staging area

• Expose external lines and supply lines, secure them, longitudinally and transversely to the profile, in the case of

Professionally re-sand, cover and compact.

• Conventional construction backfilling: for backfilling by exchange material (gravel/

Sand/mineral) supply and installation, sand sole pipelines, grain size 0/ 2 mm, min. 10 cm

strong, for pipelines at least 15 cm above the top.

or:

• Backfilling in liquid floor construction: retrieval of the demand from the supplier, splash protection

provide, create buoyancy protection, supply and install mineral concrete

• Remove and reinstall existing road caps

• Surface break-up and surface restoration

The calculation basis for the surface break-up is DIN 4124 and ZTVA-StB 97. The large and

Small paving stones must be picked up, cleaned and temporarily stored in the construction site area.

Bituminous and cementitious

Surfaces must be broken open and cut. Departure, charging, transport, disposal and

Disposal costs must be taken into account.

The calculation basis for surface restoration is ZTV "A" and ZTVA- StB 97.

Required materials such as e.B. TOK tape/pressure sensitive adhesive as well as the material for the unfastened

Delivering and installing the superstructure is to be included in the unit prices. Beyond that

Surface restorations, e.B. recuts according to ZTVA-StB 97

are to be included in the unit prices.

The additional depth is generally settled with the unpaved excavation pit.

The calculated unit prices include all civil engineering services required for the production and backfilling of a

Construction pit are required, including all difficulties, included.

Excluded from this complete performance are demonstrably required extra lengths or

Overwidth of the excavation pits if they become longer or wider due to subsequent excavations.

The unit prices are for a construction pit size of

4.00 m length x 1.5 m width x 1.75 m depth for district heating

2.00 m length x 1.5 m width x 1.00 m depth for cables

2.00 m length x 1.5 m width x 1.5 m depth for gas

2.00 m length x 1.5 m width x 1.9 m depth for water

to calculate.

The calculation of the masses is based on the actual measurement of the excavation pit, and is determined according to the specified formula if the excavation pit size is exceeded or undercut.

Measured length Measured width Measured depth

------------------------- X ------------------------- X ------------------------ =

2.00 m 1.50 m 1.75 or 1.0 m

It is expressly pointed out that the following BHB regulations of the municipal utilities

Ingolstadt are part of the contract.

F__07-01.8.1 Manufacture of pipe and cable trenches

G__Mastfundament in urban area IN

H__Aufbaustärken for excavations according to RSTO 1986

Absperrung_FW

Entlüftung_Entleerung_ FW

All of the requirements and tests made here must be met / submitted.

Download full details as .pdf
The Buyer:
Stadtwerke Ingolstadt Netze GmbH
CPV Code(s):
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
45221250 - Underground work other than tunnels, shafts and subways
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45232000 - Ancillary works for pipelines and cables
45232200 - Ancillary works for electricity power lines