The city of Plettenberg is planning a better development of the residential area Ölmühle / Friedhahn in the district of Ohle, which is located north of the DB route Hagen-Siegen. As part of this measure, a connection between the existing Ölmühle road and the B 236 is planned. This requires a transfer of this connecting road over the street “Am Friedhahn” and over the existing track system of the Deutsche Bahn AG.
With the construction of this overpass structure, the residential area "Am Stübel" to the west will also be connected to the B 236 via the Am Friedhahn street, which runs parallel to the track axis, so that the level crossing at Nordstraße can be dismantled. In order to enable pedestrians and cyclists to continue to cross the railway systems, a new foot and cycle bridge will be built west of the old level crossing at around railway km 45.675.
Services to be performed:
- Road construction,
- bridge construction work,
- Canal construction work.
New road bridge "An der Ölmühle"New road bridge "An der Ölmühle"
Quantities:
- approx. 1 200 m
- approx. 200 m
- approx. 380 m
- approx. 190 t reinforcing steel,
- approx. 260 m
- approx. 260 m
- 6 elastomer bearings,
- approx. 80 m cross bar railing.
New construction of the pedestrian bridge "Am Stübel"New construction of the pedestrian bridge "Am Stübel"
- approx. 565 m
- approx. 100 m
- approx. 590 m
- approx. 1 000 EUR backfilling for trough,
- approx. 400 m
- approx. 50 t reinforcing steel,
- 1 piece of steel superstructure (weight approx. 19 t),
- approx. 210 m
- 4 pieces of elastomer bearings,
- approx. 215 m
- approx. 190 m cross bar railing.
Road / sewer worksSection 1: Road construction, connection B236 (section 37 km 2.0 + 108) Ölmühle - Am Friedhahn
Section 2: Road construction development Am Hasentanz - Schattweg
Section 3: Sewer construction connection B236 (section 37 km 2.0 + 108)
Section 4: Canal construction development Am Hasentanz - Schattweg
Section 5: Access to the courtyard at Am Friedhahn 14
Section 6: Roof renewal on the B 236
Section 7: Reconstruction of level crossing B 236 company Novelis
- approx. 2,300 m
- approx. 1,500 m
- Pick up and dispose of approx. 330 m of curbs,
- approx. 9,000 m
- approx. 2,300 m
- deliver approx. 2,000 t of rough-cut material, install it to improve the subsoil,
- approx. 3 500 m
- approx. 3 500 m
- approx. 8,000 m
- deliver and install approx. 5 100 t antifreeze material 0/45,
- deliver and install approx. 1,400 t asphalt base layer AC 22 TS,
- deliver and install approx. 130 t asphalt binder AC 16 BS,
- deliver and install approx. 500 t asphalt surface course AC 11 DS,
- approx. 2 900 m
- approx. 21 m edging made of reinforced concrete angle supports,
- approx. 42 m retaining wall according to Processing, at your choice, including statics,
- approx. 3 700 m
- approx. 4,200 m
- approx. 41 shaft structures made of reinforced concrete DN 1000 - 1200,
- approx. 610 m sewer line made of plastic pipes, HS-R DN / OD 250 - 315 SN16,
- approx. 340 m sewer line made of plastic pipes, HS-S DN / OD 250 SN16.