Description of the assignment
The municipality of Apeldoorn is developing a new swimming pool to replace swimming pool 'De Sprenkelaar'. The main lines of the assignment are:
Carrying out the design and consultancy work required for the realization of the project;
The realization of the new building; Maintenance period and active aftercare of 24 months;
Optimization of energy consumption over a period of 24 months.
Program
Wedstrijdbad 50 x 21m
Doelgroepenbad 25 x 12,5m
Peuterbassin 40 m² 0,3m
Whirlpool 1 5 seats
Whirlpool 2 5 seats
Family slide
Commercial / social space 1.000m²
Contract form
The project will be commissioned by means of an integrated agreement, a Design & Build (DB) agreement. This means that the design, development and realization phase of the project are tendered as one assignment.
Method of registration via Negometrix3
Registration shall be made by submitting the documents requested.
Description of the assignment
The municipality of Apeldoorn is developing a new swimming pool to replace swimming pool 'De Sprenkelaar'. The main lines of the assignment are:
Carrying out the design and consultancy work required for the realization of the project;
The realization of the new building; Maintenance period and active aftercare of 24 months;
Optimization of energy consumption over a period of 24 months.
Program
Wedstrijdbad 50 x 21m
Doelgroepenbad 25 x 12,5m
Peuterbassin 40 m² 0,3m
Whirlpool 1 5 seats
Whirlpool 2 5 seats
Family slide
Commercial / social space 1.000m²
Contract form
The project will be commissioned by means of an integrated agreement, a Design & Build (DB) agreement. This means that the design, development and realization phase of the project are tendered as one assignment.
Method of registration via Negometrix3
Registration shall be made by submitting the documents requested.