New construction of a daycare center with 7 groups in 86415 Mering, "Am Mühlanger"
shell
ca. 430 m³ foundation excavation and backfilling
ca. 215 m³ anti-freeze gravel under base plate
ca. 50 m³ cast-in-place concrete foundations formed
approx. 1225 m Fundamenterder
ca. 300 m of drainage pipes including earthworks
ca. 4 pcs. Inspection shafts incl. earthworks
ca. 250 m² vibration isolation under floor slabs, on foundations
ca. 975 m² load-bearing floor slab, d=35cm
ca. 150 m³ in-situ concrete walls, d= 22-25cm, peeled
ca. 10 m³ cast-in-place concrete column, peeled
ca. 60 m³ in-situ concrete underlay and overlay, peeled
ca. 2275 m² Ortbetondecken, d=24-26 cm, geschalt
ca. 8 prefabricated staircases, some with moulded upstand or intermediate landing
ca. 160 to Bewehrungsstahl
ca. 815 m² exterior masonry, d=42.5cm or 30cm in the base area
ca. 160 m² interior masonry, d=11.5 to 24cm
approx. 2350 m² scaffolding incl. provision for finishing trades
approx. 1075 m² perimeter insulation under floor slab and foundations
ca. 185 m² MDS waterproofing plinths and foundations