General refurbishment and extension of the main building of the Kreisberufsschulzentrum in Schwäbisch Gmünd from 1972.
At the Kreisberufsschulzentrum in Schwäbisch Gmünd a pollutant remediation, general renovation and extension of the main building from 1972 should be carried out. It is a 2-storey school building with a partially built basement and a gross floor area of approximately 25 100 m
The general renovation is to be carried out in 4 phases. The plan is to start the general refurbishment in June 2019. The building completion is planned for 2023.
Parallel to the refurbishment of existing buildings, one-storey extensions with a total net floor area of approx. 1,330 m should be built on the north and east sides of the main building on the ground floor
Trockenbauarbeiten:
- about 5 900 square meters of plasterboard partitions,
- approx. 1 100 sqm of plasterboard partition walls, F30,
- About 500 m of closures.