The district of Grafschaft Bentheim is tendering for the supply of electricity with the start of delivery from 01.01.2023 (lot 2) or from 01.01.2024 (lot1) for a delivery period until 31.12.2024 with the possibility of two extensions for another year in an open procedure throughout Europe. The electricity to be supplied should come from 100% renewable energy sources (green electricity).
Tapping points without performance measurement (SLP)The total electricity requirement is 562,312 kWh/a and refers to 33 collection points.
Tapping points with registration performance measurement (RLM)The total electricity requirement is 3,619,944 kWh/a and refers to 11 collection points.