The listed monastery building is being renovated.
In addition, a new elevator tower will be attached to the refect building (inner courtyard).
built.
The work includes the following services:
Delivering, erecting, holding a scaffolding for the new elevator tower
Dimensions: 6.60 m x 3 m Height: approx. 14.50 m
For the general renovation of the monastery building, a material elevator is needed in the forecourt of the complex,
to transport the building materials to the floors. It is being rebuilt during ongoing operation.
The construction period is expected to be 6-7 years.
Supplying, setting up and keeping a material elevator ready for approx. 6 - 8 years.
with maintenance of the system.
The work essentially includes the following services:
Supplying, assembling and providing scaffolding for the attachment of the elevator tower:
6.60 m x 3.00 m, height approx. 14.50 m.
For the general renovation, a material elevator is needed in the forecourt.
Supplying, assembling, providing and maintaining a material elevator for approx. 6-7 years.