Creation of a centralised production: 7 MW wood boiler room (1.3 + 5 MW) /smoke recovery system (condensers) /CAP on returns/boiler roof/gas backup (7 + 4 MW). A timber storage autonomy of at least three days (600 m
Earth-moving work/HRD/green areas.
Lot 3: boiler room biomass/storage fuel handlingSupply and installation of a biomass/storage boiler house fuel handling.