external environmental control of the work to upgrade the RN164 to 2x2 lanes in the Merdrignac sector in the West section between Le Pont Neuf and La Boudardière
external environmental control of the work to upgrade the RN164 to 2x2 lanesIn the Merdrignac sector in the western section between Le Pont Neuf and La Boudardière