New cluster Lichtbergschule Eiterfeld, scaffolding work
The client plans to build a new building of the Lichtbergschule in Eiterfeld in
monolithic construction. The building basket body to be created is a simply structured building mass.
Trade: scaffolding work
Facade scaffolding W09 for ETICS approx. 4,100 sqm
Provision W09 approx. 65,000 sqm/W
Allowance anchoring with ETICS anchors approx. 100 pcs
Free-standing façade scaffolding up to 10 m façade height approx. 530 sqm
Provision WO9 freestanding approx. 6,000 sqm/W
Surface extensions 109 cm on balconies approx. 6 pcs.
Provision of surface extensions 109 cm approx. 100 pcs./W
Settling platform for insulation Size approx. 500 x 65 cm 10 pcs.
Innengeländer ca. 1,750 lfdm
Provision of interior railings approx. 18,500 m/W
Working scaffold W06 for interior plaster auditorium approx. 570 qm
Provision W06 approx. 6,000 sqm/W
Scaffolding auditorium and stage approx. 4,500 cbm
Provision of scaffolding approx. 55,000 cbm/week
Gerüsttreppen Within approx. 2 pcs.
Provision of scaffolding stairs inside 32 pcs./week
Scaffolding stairs outside approx. 90 stgm.
Provision of scaffolding stairs outside approx. 1,200 stgm/W
Stair tower outside 1 m running width approx. 10 stgm
Provision of outdoor stair tower 600 m/f
Construction hoist 1.5000 kg 1 pcs.
Provision of construction hoist approx. 32 pcs./W