Offshore fabrication work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 February 2022
Closing Date:
24 February 2022
Location(s):
IE062 Mid-East (IE IRELAND)
Description:
Marine Substructures Supply, Transport & Installation

Arklow Bank Wind Park Phase 2 (“Project”) is an offshore wind farm located approximately 6km to 15km off the coast of Arklow, Co. Wicklow and covers an area approximately 27km long and 2.5km wide. The Project will have a Maximum Export Capacity (MEC) of up to 800MW and will consist of up to approximately 62 turbines and will participate in Ireland’s first Offshore auction in late 2022 / early 2023.

The scope includes responsibility for the supply, fabrication, storage, loadout, transportation, install, testing, commissioning and completion of monopile and Transition Piece (if applicable) based Wind Turbine Generator (WTG) Substructures, including secondary and tertiary steel in accordance with the Employer's Requirements and Programme. The Contractor will be responsible for the seafastening, transportation, installation, hookup, commissioning and completion of the WTG substructures, including monopile foundations, transition pieces (if applicable) and all related secondary and tertiary components.

The scope shall include responsibility for all project management, quality management, health and safety management, interface cooperation, fabrication engineering, supply chain management, loadouts activities and logistics, transportation and installation related design and engineering, lift engineering, marshalling ports, temporary works, interface management, materials, procurement and contracting required to safely and successfully deliver the works.

Download full details as .pdf
The Buyer:
Sure Partners Limited
CPV Code(s):
45255410 - Offshore fabrication work
45262424 - Offshore-module fabrication work