Electrical installations and lighting
Assembly and connection of 2 distribution boxes
• Connection of 1 rail lubrication system cabinet
• Delivery, installation and connection of 16 luminaires under weather protection roofs
• Supply of 10 luminaires for the installation and connection of the chipped lighting (central platform)
• Supply of 18 luminaires for the installation and connection of the pole lighting (side platform)
• Delivery and installation of the cable system (Elt. and lighting) approx. 4200 m, FM cable approx. 1950 m and fiber optic cable approx. 150 m.
• Ready-to-use installation and connection of the new telecommunications equipment (1 ticket machine, 2 emergency call call station, 3 destination indicators, 3 clocks, 2 information displays and 2 bus destination indicators)
• Carrying out functional tests of the circuits and all necessary measurements in accordance with the VDE regulations
• Testing and creation of measurement reports for the FM and fiber optic cables and installation measurement reports for the distribution cabinets
• Grounding system
• Check the continuity of the cable protection pipes.