— Main inspections and reports in BRUTUS. The contract includes approx. 300-400 bridges per annum for the period from 2015 to 2019. The inspections shall be carried out above waters and the bridges are located in Hedmark and Oppland.
— Main inspections of foundations/erosion protection below water, as well as reports in BRUTUS. The contract includes approx. 20 -30 bridges per annum. The bridges are located in Hedmark and Oppland and the contract period is from 2015 to 2019.