B 29 extension Essingen - Aalen; here: construction phase 1, part 3.
Road construction Bundestraße B 29 and drainage works:
- Upper floor application / removal 20,000 m³, earthwork application / removal 160,000 m³, asphalt foundation layer install 28 600 m
- Install asphalt base course 28,000 m
- Install asphalt surface courses 27 300 m
- Shafts 111 pieces of paving / slabs / shelves / channels 1 400 m.
Road construction connection L 1080 and L 1165, ramps:
- Pave asphalt foundation layer 9 800 m
- Install asphalt base course 9 100 m
- Install asphalt surface courses 9 000 m
Road construction KVP Stockert and Daimlerstrasse:
- Install asphalt foundation layer 4 100 m
- Install asphalt base course 3 800 m
- Install asphalt surface courses 3 600 m
Road construction Bahnhofstrasse / access Go-Ahead:
- Install asphalt base course 3 200 m
- Install asphalt surface courses 3 200 m
- Build structures 2, 3, 4a and 4b.
Working for the municipality of Essingen and GEO:
- sewage pipes / canals approx. 430 m, water pipe approx. 530 m, broadband drainage pipes (trench length) approx. 1,000 m;
- Road works Bahnhofstrasse approx. 1,400 m
- Street lighting (ditch length) approx. 2,000 m, gas pipeline laying approx. 750 m.