The planned helicopter landing pad will be built as an elevated platform above the flat roof construction of the new building, F1, which is currently under construction and is currently under construction.
The supporting structure of the platform is to be planned as a steel structure.
The measure replacement 2-3. BA with the building parts F1 and G is located in the south-east area of the property of the Friedrich-Ebert-Krankenhaus (FEK) in Neumünster. Access to the construction site is via the Sachsenring road. The building part F1 is enclosed on almost all sides by buildings. The building section F1 borders directly on existing building sections in which hospital operations continue. Special care must therefore be taken in the peripheral areas of the construction site. Building part G is a completely new building on an existing open space and connected via F1.
- raised steel structure approx. 4.00 m high;
- maximum take-off mass 12.0 t;
- The landing area is around Ø 30.50 m.