New office and laboratory building (GO IN II) in the Potsdam-Golm Science Park.
Gerüstbauarbeiten- 3 400 m
- 200 m
- 1 600 m set-up console 30 cm wide;
- 1 600 m internal railing;
- 200 m side protection;
- 4 stair towers, height 16.40 m;
- 840 m³ of space scaffolding LK3 with 75 m
- 2 pieces construction hoist 500 kg.
Provision of 21 weeks beyond the basic operating time.