Work program: The work resulting from the studies will lead to the dismantling of the concrete slab of the bridge, repair and repaint the metal structure, renovate the masonry vaults, implement a light and ventilated pedestrian/cycle deck. The work program includes at least the repairs of the disorders listed in Part II of the Dce for the metal structure and access structures as well as the transformation of the structure into a bicycle/cycle and pedestrian link. The mission of the project manager includes the diagnosis of the work, the design studies as well as the control of the execution studies and the follow-up of the works until their acceptance
Work program: The work resulting from the studies will lead to the dismantling of the concrete slab of the bridge, repair and repaint the metal structure, renovate the masonry vaults, implement a light and ventilated pedestrian/cycle deck. The work program includes at least the repairs of the disorders listed in Part II of the Dce for the metal structure and access structures as well as the transformation of the structure into a bicycle/cycle and pedestrian link. The mission of the project manager includes the diagnosis of the work, the design studies as well as the control of the execution studies and the follow-up of the works until their acceptance