For lot 06-032 landscaping work, the following work will be necessary in the NaturThermeTemplin:
- 750 m² of concrete stone paving, removing steps, handrails, benches, planters, fence, bollard lights
- 500 m² grubbing
- 115 m³ of excavated soil
- 20 m³ trench excavation
- 20 m³ of bedding and backfilling trench
- 30 m rainwater duct DN 110
- 9.5 m flat gutter with cover, partly with trace heating
- 90 m cable warning tape
- 20 garden lighting
- 20 m² outdoor heating
- Work up an existing 80 m privacy fence made of steel posts and wooden planking
- Deliver and install 28 m privacy fence
- Deliver and install 2 door systems with privacy screen
- Deliver and install 5 m privacy screen
- 850 m² building ground plan
- 75 m³ frost protection layer
- 225 m³ ballast layer
- 15 m³ concrete foundations
- 5 rocks for garden design
- 50 m on-board systems
- 145 m flower bed edging, banding
- 150 m² of gravel, pebbles, eaves strips
- 20 m tape
- 55 m² concrete stone paving
- 635 m² of ceramic paving including for stairs
- 22 footplates
- 2 rubbish bins
- 65 m² wooden platforms, some with backrests
- 6 m handrail
- 4 planters
- 1 bronze sculpture
- 1 fire pit
- 3 granite basins
- Create 460 m² of planting and lawn areas, plant perennials and grasses, plant bulbs
- 13 st shrubs
- 11 trees planting
- completion care
Title brine bad/children's play area:
- 800 m² of concrete stone paving, removing steps, handrails, benches, planters, bollard lights
- 300 m² grubbing
- 100 m³ of excavated soil
- 30 m³ trench excavation
- 30 m³ of bedding and backfilling trench
- 6 rainwater and drainage shafts
- 30 m drainage pipe
- 40 m rainwater duct DN 110
- 14 m flat gutter with cover, partly with trace heating
- 3 yard drain
- 70 m cable warning tape
- 25 outdoor lighting
- 18 m natural stone steles including concrete foundations
- 12 m² dry masonry including substructure
- 950 m² building ground plan
- 310 m³ frost protection and gravel base layer
- 20 m³ concrete foundations
- 3 rocks for garden design
- 45 m on-board systems
- 85 m soft edge stone
- 25 m flower bed edging, banding
- 8 m² gravel surfaces, eaves strips
- 165 m² concrete stone paving
- 415 m² of ceramic paving including for stairs
- 85 m² natural stone paving
- 230 m² plastic covering as fall protection
- 2 rubbish bins
- 15 m² wooden platforms with backrests
- 6 m handrail
- 4 planters
- 1 pc slackline
- 1 balancing track
- 1 ground trampoline
- 3 child seats
- 3 seat cushions
- 1 St. Liana path
- 1 mosaic art sculpture
- Create 175 m² of planting and lawn areas, plant perennials and grasses, put onions
- 68 shrubs
- 3 plant trees
- completion care
Title dwarf god enclosure:
- 85 m² building ground plan
- 23 m³ gravel base, sands
- 1 replacement source stone
- 1 piece set Quellstein bubble nozzle
- 1 pump shaft
- 1 pump, accessories
- 1 gate valve
- 20 m PP pipe DN 110
- 1 pc expiration
- 5 m³ concrete watercourse
- 5 m² concrete modelling
- 1 slide
- 10 m³ concrete base
- 30 m modelling on a concrete base
- 31 m glass railings
- 1 glass door
- 2 signage
- 1 psch rocks, roots, hollow stems, dry ravens
- 6 shrubs including finishing care
Title outdoor facilities children's playhouse:
- 1 pc. Implementing container location
- 40 m² building ground plan
- 10 m³ frost protection and gravel base layers
- 3 m on-board system
- 2 m² concrete stone paving
- 60 m tape
- 25 m² asphalt, close excavation again
- 15 m³ concrete foundations
- 1 door system grid filling
- 45 m lattice fence
- Create 150 m² of lawns including completion maintenance
The NaturthermeTemplin (NTT) is a thermal bath opened in 2000 in
Templin. It is a spa and recreation facility of supraregional importance and is particularly focused on families. NTT was built from 1998 to 2000 and was extensively renovated and partially rebuilt in 2006.
The aim for the planned measures to attractiveness NTT is to further adapt the building, attractions and offers of NaturthermeTemplin GmbH to the needs of the guests and to further increase the quality of stay. In addition, attractions and framework conditions for the warm season are to be created in order to achieve consistent utilization stability. For this purpose, a new sauna cabin, a children's playhouse with an integrated water splash area and dwarf gods, and a guardwork will be built outdoors, among other things.