Natural gas | Tenderlake

Natural gas

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 October 2022
Closing Date:
08 November 2022
Location(s):
PL431 Gorzowski (PL Poland/POLSKA)
PL432 Zielonogórski (PL Poland/POLSKA)
PL517 Wałbrzyski (PL Poland/POLSKA)
Description:
Gorzów Purchasing Group. Comprehensive supply of natural gas in the period from 01.01.2023 to 31.12.2023

The subject of the contract is a comprehensive supply of gaseous fuel - the supply of high-methane natural gas with the symbol E together with the distribution service - in the period from 01.01.2023. until 31.12.2023 - up to 157 collection points (PPG). The projected amount of gaseous fuel is 1 797 668 m3 (20 493 403 kWh using a conversion factor of 11.4).

The above data are indicative. The contractor should take into account possible fluctuations in collection. Reducing or increasing the amount of gaseous fuel does not entail any consequences for the ordering party (recipients), except for the need to pay for the amount of gas actually taken and transmission services in accordance with the applicable DSO Tariff.

1. The subject of the contract is a comprehensive supply of gaseous fuel – the supply of high-methane natural gas with the symbol E together with the distribution service – in the period from 01.01.2023. until 31.12.2023 - up to 157 collection points (PPG). The projected amount of gaseous fuel is 1 797 668 m3 (20 493 403 kWh using a conversion factor of 11.4).

The above data are indicative. The contractor should take into account possible fluctuations in collection. Reducing or increasing the amount of gaseous fuel does not entail any consequences for the ordering party (recipients), except for the need to pay for the amount of gas actually taken and transmission services in accordance with the applicable DSO Tariff.

2. Details of gaseous fuel consumption, distribution parameters at individual consumption points are described in Annex 1 to SWZ - List of PPG collection points.

3. PpG was subject to the proceeding, in which customers are "subject to tariff protection", i.e. customers referred to in Article 62b(1)(2) of the Pe Act and customers not covered by this protection. In Appendix 1 to the SWZ, the contracting authority indicated to which PPG the provisions of Article 62b apply and according to which percentage. The Contracting Authority (recipients), together with signing the contract with the contractor whose offer will be selected as the most advantageous, will submit appropriate Statements of the recipient of gaseous fuels (from Article 62ba and / or Article 62bb of the Pe Act).

Download full details as .pdf
The Buyer:
Miasto Gorzów Wlkp.
CPV Code(s):
09123000 - Natural gas
65200000 - Gas distribution and related services
65210000 - Gas distribution