Expansion of the Gemeinschaftsschule Korb at the Urbanstraße site - Expansion of new construction and energy renovation Total construction costs (KG 100-700): 9 423 000 EUR Gross GFA: 2 230 m² BRI: 8 800 cbm Trade: Facade works.
Lot 1 wood-aluminum windows and PR facade
- 91 sqm wooden-aluminum window elements,
- 27 sqm door elements outside,
- 200 sqm post and beam façade aluminum,
- Sun protection external blinds.
Lot 2 wood-aluminum windows and PR façade
- 47 sqm / 29 pieces of wood-aluminum single window,
- 345 sqm / 15 pieces of wood-aluminum window elements,
- 270 square meters of cross-laminated timber railings,
- Sun protection external blinds.