Refuse disposal and treatment | Tenderlake

Refuse disposal and treatment

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 December 2021
Closing Date:
17 January 2022
Location(s):
PL921 Radomski (PL Poland/POLSKA)
Description:
Reception, transport and management of dehydrated sewage sludge code 190805 originating from the Wastewater Treatment Plant in Radom

1. The object of the order is the collection, transport and development of fermented, current, dehydrated (approx. 25% s.m.) of sewage sludge originating from the Wastewater Treatment Plant in Radom.

2. The total estimated amount of dehydrated sewage sludge with a content of approx. 25% s.m.o. within 12 months shall be determined at approximately 15 000 Mg.

3. Loading of dehydrated sewage sludge will be carried out by the Contractor in his own right and at his own expense.

4. The Contractor will receive the sewage deposits in question by his own transport or at his own expense.

5. Reception of dehydrated sewage sludge will be carried out on an ongoing basis, i.e. according to the current production from the square for the temporary collection of sediments at the site of the Wastewater Treatment Plant in Radom on a telephone or e-mail request.

1. The object of the order is the collection, transport and development of fermented, current, dehydrated (approx. 25% s.m.) of sewage sludge originating from the Wastewater Treatment Plant in Radom.

2. The total estimated amount of dehydrated sewage sludge with a content of approx. 25% s.m.o. within 12 months shall be determined at approximately 15 000 Mg.

3. Loading of dehydrated sewage sludge will be carried out by the Contractor in his own right and at his own expense.

4. The Contractor will receive the sewage deposits in question by his own transport or at his own expense.

5. Reception of dehydrated sewage sludge will be carried out on an ongoing basis, i.e. according to the current production from the square for the temporary collection of sediments at the site of the Wastewater Treatment Plant in Radom on a telephone or e-mail request.

6. The amount of waste will be confirmed each time on the waste transfer card generated in the BDO system, after weighing on weight. Weighing will be performed at the expense of the Ordering Party. In the event of a failure of the weight, the average weight of waste delivered by the vehicle in the previous month will be the basis for calculating the receivable.

7. The Ordering Party will supply only its own sewage deposits, i.e. coming from the Wastewater Treatment Plant in Radom with code 19 08 05, in accordance with the Waste Act of 14.12.2012.

8. The Ordering Party will supply up to 350 Mg of dehydrated sewage sludge per week, which will be systematically developed by the Contractor. The release of sediments will follow the schedule:

on Monday — up to approx. 150 Mg;

Tuesday to Friday — up to approx. 50 Mg per day.

9. Reception of dehydrated sewage sludge will take place on working days from Monday to Friday from 8:00 to 14:00. In exceptional situations, sediment collection may take place on a Sunday or other statutory day (e.g. Saturday or on holiday days) from 8:00 to 14:00.

Download full details as .pdf
The Buyer:
Wodociągi Miejskie w Radomiu sp. z o.o.
CPV Code(s):
90510000 - Refuse disposal and treatment
90513600 - Sludge removal services
90513700 - Sludge transport services
90513800 - Sludge treatment services
90513900 - Sludge disposal services