Creation of two excavation pits
Excavation pit AA1 two-storey underground car park with an office building
Excavation pit AA2 office building
- Excavation pit AA1
In this construction site, a new building with a 2-storey building
Basement (underground car park) planned. For the production of the
Due to the local conditions, the new building is a
Excavation pit stabilization required. In this case, dissolved and
tangent bored pile walls with different diameters
(DN 620 to DN 1200), mainly back-anchored,
envisaged. In the area of existing buildings,
Underpinnings in the jet jet method (DSV) are planned.
Excavation pit dimensions: 35.0 m x 58.0 m
- Excavation pit AA2
The new building in this construction site is to have a 1-storey basement
become. Southwest of the excavation pit (area building H) is a
Shoring planned as a girder plank wall. Along the remaining
areas, the creation of embankments is possible.
Excavation pit dimensions: 30.0 m x 30.0 m
-Ditch
In the immediate south-eastern adjoining of construction site AA2, a
Trench for drainage of the newly constructed buildings on both sides
construction plots.
Events:
see tender documents (installations and list of installations - construction schedule)
The contracting authority would like to point out that, in order to ensure a speedy procedure, only bidders' enquiries received by the contracting authority in good time can be answered.
Tempting: 10/24/2023