Procedure with Negotiation pursuant to Article R. 2124-3 of the Public Order Code
this consultation consists of 19 lots.
the services will be remunerated by applying the global and fixed price for all the lots.
As an indication, the estimated date of commencement of services is: May 2024
Vrd Structural workVrd Structural work
Movable partitionMovable partition
Platerie IsolationPlaterie Isolation
Suspended ceilingsSuspended ceilings
Plumbing heating ventilationPlumbing heating ventilation
Electricity strong and low currents SsiElectricity strong and low currents Ssi
ElevatorElevator
Sealed floor coverings EarthenwareSealed floor coverings Earthenware
Glued floor coveringsSealed floor coverings Earthenware
PaintingPainting
Green Spaces PlantationsGreen Spaces Plantations
cleaningcleaning
Wood frameWood frame
Metal Cover Metal CladdingMetal Cover Metal Cladding
SealingSealing
Aluminum exterior joineryAluminum exterior joinery
PVC exterior joineryPVC exterior joinery
Metalwork locksmithMetalwork locksmith
Interior wood joineryInterior wood joinery