1. The subject of the contract is the supply of electricity in the period from 1.7.2019 to 31.12.2020 to 1 299 consumption points (PPE) with a total estimated volume (+/- 10%) 15 912.52 MWh, of which :
1) For premises and facilities (Part I of the contract) - 9,982.08 MWh - a detailed list of PPE is attached as Annex 1a to the Terms of Reference
2) For the purposes of road lighting (Part II of the contract) - 5,930.44 MWh - a detailed list of PPE is attached as Annex 1b to the Terms of Reference.
The forecast electricity consumption indicated above is indicative and may differ from the amount of energy actually consumed during the contract period. Reducing or increasing the amount of energy consumed does not entail any consequences for the contracting parties (recipients), except for the need to pay for the energy actually consumed at the rates specified in the Contract.
All details are specified in the Terms of Reference.
Supply of electricity to premises and facilities1. Number of measuring systems accounting for electricity consumed 468 pcs.
2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1a to the ToR.
3. Estimated electricity consumption during the contract period (+/- 10%) 9,982.08 MWh, of which:
Zone I 7 199.94 MWh
Zone II 2,782.14 MWh
Zone III 0.00 MWh
The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.
4. Deliveries will take place from 1.7.2019 to 31.12.2020 with the proviso that the details regarding delivery dates (start and end) in relation to individual collection points are described in Annex 1a, column "Delivery period".
5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'Delivery period'). The obligation to terminate the contracts lies with the contracting authorities (recipients).
Supply of electricity for the needs of road lighting1. Number of measuring systems accounting for consumed electricity 831 pcs.
2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1b to the ToR.
3. Estimated electricity consumption over the contract period (+/- 10%) 5,930.44 MWh, of which:
Zone I 5 203.00 MWh
Zone II 727.44 MWh
Zone III 0.00 MWh
The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.
4. Deliveries will take place from 1.7.2019 to 31.12.2020 subject to the proviso that details regarding delivery dates (start and end) in relation to individual tapping points are described in Annex 1b, column "Period supply ".
5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'Delivery period'). The obligation to terminate the contracts lies with the contracting authorities (recipients).