Over a length of 470 m, the construction of an avalanche gallery is planned. The retaining walls on the valley side, including a cantilevered footpath and cycle path connected to them, have already been realised in a preliminary measure. Furthermore, the construction of a company building in the area of the south portal and the upgrading of the asphalted areas of the north and south portals with the associated drainage facilities is planned.
Over a length of 470 m, the construction of an avalanche gallery is planned. The retaining walls on the valley side, including a cantilevered footpath and cycle path connected to it, have already been realised in a preliminary measure. Furthermore, the construction of a company building in the area of the south portal and the upgrading of the asphalted areas of the north and south portals with the associated drainage facilities is planned.