The contract includes the reconstruction of the current university in Borlänge, Kv. Intagan 2. Redevelopment and adaptation to Upper Secondary School 2025. Miljöbyggnad silver shall be sought in the design.
The contract is carried out in partnering (also called extended collaboration or collaboration contract), whereby the Client and the Contractor shall jointly solve tasks that are continuously faced with in an open collaboration with a project organization that is integrated in some parts.
The contract includes the reconstruction of the current university in Borlänge, Kv. Intagan 2. Redevelopment and adaptation to Upper Secondary School 2025. Miljöbyggnad silver shall be sought in the design.
The contract is carried out in partnering (also called extended collaboration or collaboration contract), whereby the Client and the Contractor shall jointly solve tasks that are continuously faced with in an open collaboration with a project organization that is integrated in some parts.