The city of Nordhausen is planning to build a new fire service center for the joint use of professional volunteer and youth fire brigades. The total size of the property is approx. 11 250 m
The service advertised here includes the delivery and installation of a vibrating floor on a separating layer including a base in the vehicle hall, the adjoining hall and the adjoining storage and workshop rooms.
A subdivision of this service into further lots is not planned (see point II.1.6.)
- approx. 1,400 sqm separating layer made of PE film,
- approx. 1,400 square meters of vibrating tiles 200 x 100 mm in R11 to R12 V4 laid on the slope of the floor slab
- approx. 200 running meters of base h = 100 mm including mitred corners,
- approx. 200 running meters of lane marking consisting of a darker vibrating tile,
- approx. 150 running meters of on-site stainless steel and heavy-duty channels,
- approx. 460 running meters of expansion joint profiles,
- approx. 1,400 square meters of basic cleaning.