The contract includes the technical building equipment of the "Building Automation" system group for the 5th construction phase at the hospital
Ansbach. This measure affects existing parts of the building that are completely or partially renewed, depending on the respective level.
can be installed. The technical systems for supplying this part of the building will be completely rebuilt and will have to be
can be coupled with existing control technology.
Building and plant automation:
- install approx. 370 field devices (temperature sensor, actuator, etc.)
- 2 automation focuses with associated power units, assemblies and automation management
- approx. 13,200 m cables and wires up to 5x25 mm² plus installation systems and accessories