Drywall work (walls, ceilings), smoke curtains, wooden doors, window sills, glass walls, painting, mobile partition
A DESYUM visitor centre is being built on the DESY campus in Hamburg. Building dimensions:
Gebäudebreite ca. 31 m
Gebäudelänge ca. 31 m
Building height approx. 24 m
Basement from approx. 4.80 to approx. 5.8 m
The subject of this specification is drywall construction work (walls, ceilings), smoke curtains, wooden doors, window sills, glass walls, painting work, mobile partition wall.
Execution of the following services is planned:
Trockenbauarbeiten
GK walls approx. 2650 m2
GK ceilings, GK acoustic ceiling approx. 1300 m2
Akustikdeckensegel ca. 390 St
Lamellendecke as . 240 m2
Window sills: Installation of window sills, balustrade covers approx. 370 m
Wooden doors with wooden and steel frames in different sizes. Fire protection qualities approx. 164 pcs
Glass walls F30 approx. 70 m2
Interior insulation approx. 80 m2
Rauchschutzvorhänge 8 St
Rauchschürzen 4 St
painting work
Deckenanstrich ca. 7.000 m2
Wandanstrich ca.10.500 m2
Bodenanstrich ca.. 850 m2